Skip to content
SapphireRoofing & ConstructionAnswered 24/7(405) 864-0080
New roofs in Oklahoma City

Solar panel removal and reinstall for Oklahoma City roof work

Rooftop solar has become common across the Oklahoma City metro, and so has the problem that follows a big spring hailstorm: the shingles under the array are bruised, but the panels are bolted on top of them. A roof cannot be replaced around solar panels. The array has to come off, and it has to go back on correctly.

Solar panels removed during a roof replacement near Oklahoma City

Answered 24/7Call (405) 864-0080 and talk to Sapphire.

Quick answer

When a roof under solar panels needs repair or replacement, the array has to come off first. Sapphire detaches the panels and racking, stores them safely, completes the roof work, flashes new mounts into the new roofing and resets the array. The electrical disconnect and reconnect are coordinated with a qualified solar or electrical professional where required.

Sapphire handles the roofing side of that job with our own crews. We plan the detach and reset, protect the panels while they are off, build the new roof with proper flashing at every mount, and work with your solar provider or installer on the electrical steps that belong to them.

Why solar panels come off for roof work

Solar arrays sit on rails that are bolted to the roof through mounts, and each mount is a hole through the shingles and decking. To tear off and replace those shingles, or to repair decking under the array, the panels and rails have to be lifted out of the way.

It also makes sense to look at timing. If your roof is nearing the end of its life, putting a new roof on before solar goes up avoids paying for a detach and reset a few years later. If the array is already there and the roof is hail-damaged, removal and reinstall becomes part of the repair.

Coordinating with your solar provider or installer

Before anything is unbolted, we find out who installed the system and whether a monitoring company, lease company or original installer is still involved. Some leased and financed systems have rules about who may touch the array, and some installer workmanship coverage depends on how roof penetrations are handled. Your paperwork usually spells this out.

Sapphire is a roofing contractor, not an electrical contractor. The electrical shutdown, disconnecting panel wiring and reconnecting the system afterward are coordinated with a qualified solar or electrical professional where required, often your original installer. We schedule our roofing work around their visits so the system is offline for as short a time as practical.

  • Who installed the system and who services it now
  • Whether the system is owned, leased or financed
  • Any installer rules about roof penetrations or mounting
  • Who will handle the electrical disconnect and reconnect

Removing the array and protecting the panels

Once the electrical side is safely shut down, we photograph and map the layout of the array so it goes back exactly where it was designed to sit. Panels are lifted off the rails and carried down by hand, never slid down the roof or stacked face to face.

Panels are stored on edge or flat on padding, out of the way of the dumpster and roofing debris, and covered to keep dust and nails off the glass. Rails, clamps and hardware are bagged and labeled. Where storage on site is not practical, we talk through other options with you before the job starts.

Flashed solar mount in new architectural shingles

Inspecting mounts and penetrations under the array

With the panels off, the roof under the array is visible for the first time since the system went in, and that is often where problems hide. We check each mount for the flashing type, whether it was sealed only with caulk, whether lag bolts actually hit rafters, and whether there is any staining or soft decking around the holes.

Debris also collects under arrays. Leaves, sticks and the occasional bird nest trap moisture against the shingles. We document what we find with photos so you and, if a claim is open, your insurer can see the condition of the roof under the panels.

Flashing solar mounts into the new roof

The most important part of the reinstall is what you cannot see once the panels are back. Each mount on a shingle roof needs a flashed base that slides under the course above and sheds water over the course below, with the lag bolt sealed where it passes through the decking into the rafter.

We do not simply drive mounts through new shingles and squirt sealant around them. Old holes from the previous mounts are filled and sealed in the decking before underlayment goes down. If the new layout needs mounts in different spots to land on rafters, we coordinate that with the solar professional so the array still lines up.

Resetting the array on the finished roof

After the new roof is on and the mounts are flashed, rails go back up and panels are reset to the original layout, using the hardware and clamps specified for that racking system. Damaged clamps or end caps get replaced with matching parts rather than reused.

The qualified solar or electrical professional then reconnects and tests the system. We clean up, check the roof edges and gutters for leftover hardware, and walk you through photos of the flashing under the array so you know what is protecting those penetrations.

Hail claims and detach-and-reset coverage

When hail damages a roof under solar, the insurance estimate often includes a line item for detaching and resetting the panels, because the roof cannot be replaced without it. Whether it is covered, and how much, depends on your policy and the adjuster's findings, so read your declarations page and estimate.

Sapphire works with homeowners through the claim process by documenting damage and explaining the scope of the roofing work. We are not public adjusters and do not negotiate on your behalf. Hail can also damage the panels themselves, which your solar provider should inspect separately.

Signs to watch for

When it is time to call about solar panel removal and reinstall

1

Hail damage under the array

Bruised shingles around the panels mean the roof needs work that requires removing the array first.

2

Roof near the end of its life

Replacing an aging roof before or during a solar project saves a second detach later.

3

Leak stains below the array

Ceiling spots under the panel area often trace back to a poorly flashed mount.

4

Caulk-only mount seals

Mounts sealed with a blob of caulk instead of flashing tend to leak as the sealant ages in the sun.

5

Debris trapped under panels

Leaves and nests that hold moisture against shingles can speed up wear under the array.

6

Insurance estimate includes detach and reset

If the adjuster wrote it into the scope, the array has to come off for the roof replacement.

How the job runs

How our crew handles solar panel removal and reinstall

The same people who look at your roof are the ones who do the work, and they explain each step before it happens.

Call (405) 864-0080
  1. 01

    Plan and coordinate

    We confirm who owns and services the system and schedule the electrical disconnect with a qualified solar or electrical professional.

  2. 02

    Map and remove

    We photograph the layout, remove panels and racking by hand, and label all hardware.

  3. 03

    Store and protect

    Panels are padded, covered and kept clear of roofing debris for the length of the job.

  4. 04

    Roof and flash

    Our crew repairs or replaces the roof, seals old holes and installs flashed mounts into the new shingles.

  5. 05

    Reset and review

    Panels go back to the original layout, the system is reconnected by the qualified professional, and we review flashing photos with you.

Pricing, plainly

What affects the cost of solar panel removal and reinstall

Every roof is priced after we have seen it. These are the things that move the number up or down.

  • The number of panels and the size and layout of the array.
  • Racking type and whether clamps, end caps or rails need replacing.
  • Roof pitch, height and how many roof planes the array covers.
  • The number of mounts that need new flashing in the new roof.
  • Storage needs if the panels cannot stay safely on site.
  • Separate charges from the solar or electrical professional for the disconnect, reconnect and testing.

Need solar panel removal and reinstall in Oklahoma City?

Call any hour. Our own crew inspects, photographs and explains the fix before any work starts.

Call (405) 864-0080
FAQ

Solar Panel Removal and Reinstall questions

Who handles the wiring during a solar panel removal and reinstall?

The electrical disconnect and reconnect are coordinated with a qualified solar or electrical professional where required, often your original installer. Sapphire handles the roofing side: removing the panels and racking, protecting them, building the roof and flashing the mounts.

Does solar panel removal and reinstall affect my solar installer's coverage?

It can. Some installers want to do or approve any work involving their mounts and penetrations. Check your solar agreement before the job, and we will coordinate with the installer so the work follows their requirements.

Will insurance pay for solar panel removal and reinstall after hail in Oklahoma City?

Many hail claims that include a roof replacement also include a detach-and-reset line for the solar array, since the roof cannot be replaced otherwise. Coverage depends on your policy and the adjuster's findings, so review your estimate and declarations page.

How long are panels off the roof during a solar panel removal and reinstall?

Usually for the length of the roof job plus the time to schedule the reconnection. Weather and the solar professional's availability are the main variables, so we plan the visits together before the panels come off.

Are new holes made in the roof during a solar panel removal and reinstall?

Yes, the mounts are reattached through the new roofing, each with a flashed base. Old holes are sealed in the decking before the underlayment goes down, so they are not left open under the new shingles.

Related work

Other services homeowners pair with this

Roof Replacement

Full tear-off roof replacement in Oklahoma City, from decking checks and underlayment to a magnet sweep of your yard.

Learn more

Hail Damage Roof Repair

Hail inspections that look for bruised shingles, granule loss and fractured mats, plus repair or replacement after an OKC hailstorm.

Learn more

Roof Flashing Repair

Repair and replacement of step, counter, chimney, wall, valley and pipe boot flashing, the joints where most roof leaks begin.

Learn more

Where we do solar panel removal and reinstall

Oklahoma City and the surrounding metro, including:

Westmoore, Oklahoma CityYukonChoctawThe VillageCanadian CountyLansbrook, Oklahoma CityCrown Heights, Oklahoma CityGatewood, Oklahoma CityAll service areas
Call (405) 864-008024/7