A roof on new framing is a different job from replacing an old one. There is no tear-off, but there is a schedule: drywall, electrical and plumbing crews are waiting on a dry building, and every rain day with an open deck costs the whole project time.

New home roof dried in during construction near Oklahoma City

Answered 24/7Call (405) 864-0080 and talk to Sapphire.

Quick answer

New roof installation covers roofs on new homes, room additions, detached garages and shops in the Oklahoma City area. Sapphire's crew works from your framing schedule, dries in the structure quickly so interior trades can start, ties new sections into existing roofs without leaks, and leaves the roof ready for the builder's next inspection step.

Sapphire installs roofs on custom homes, room additions, garages and outbuildings around Oklahoma City, from new subdivisions on the far west side to infill lots closer to downtown. Our own crews handle the work, and we coordinate directly with homeowners acting as their own general contractor or with the builder running the job.

Working with builders and owner-builders

On a new build, the roofer is one trade in a long line. We ask for the plans early so we can confirm pitch, overhangs, valley layout and any roof-mounted items like solar conduit, plumbing vents or a range hood exhaust before the trusses go up.

If you are building your own home or addition, we explain the order of work so nothing gets out of sequence. For example, the framer should set fascia and sub-fascia before we arrive, and the mechanical contractor should know where vent penetrations will land so they are not cut through a valley later.

The dry-in schedule and why it matters

Dry-in is the point where the deck is covered with underlayment and the building can take rain without soaking the framing. On most builds we aim to dry in as soon as the sheathing is nailed off, then return for shingles or metal once windows and other trades are moving.

Oklahoma spring weather can turn from clear skies to a line of storms in an afternoon. A fast dry-in protects OSB sheathing, which swells along its edges when it sits wet. Swollen edges telegraph through finished shingles as ridges, so keeping the deck dry is about appearance as much as leaks.

  • Confirm sheathing is fully nailed before underlayment goes down
  • Install drip edge and underlayment the same day when possible
  • Seal valleys and wall intersections first
  • Return for the finished roof covering on the agreed date

Getting ready for framing and roof inspections

Cities around the metro, including Oklahoma City, Edmond and Moore, require permits and inspections on new construction. The framing inspection usually happens before insulation and drywall, and the inspector may want to see roof sheathing nailing, truss bracing and hurricane ties or straps.

We will not cover sheathing that the builder still needs inspected unless the inspection has been passed or the inspector agrees. Covering it early can force a crew to peel back underlayment, which costs everyone time. We keep our part of the schedule flexible around that step.

Addition roof tie-in valley with new flashing

Tying an addition into an existing roof

Additions are where most new-roof leaks start. The new roof has to meet the old one at a valley, a wall or a ridge, and the shingles, underlayment and flashing on both sides need to overlap in the direction water flows.

We cut back the existing shingles far enough to weave or close-cut a proper valley, extend ice and water shield under both roof planes, and install new step flashing where the addition roof runs into a sidewall. If the old shingles are discontinued or faded, we talk about color matching honestly, because a perfect match on a ten-year-old roof is rarely possible.

Choosing a roof covering for a new structure

On a new home you are not locked into what was there before. Many owners in the metro now choose Class 4 impact-resistant shingles or standing seam metal from the start, because the structure is designed for it and there is no tear-off cost to weigh against the upgrade.

Detached shops and garages are often good candidates for exposed-fastener metal panels, while the main house gets shingles that match the neighborhood or HOA rules. We help you compare options against the pitch, the budget and any subdivision covenants.

Ventilation and attic design on new construction

It is much easier to build ventilation in than to fix it later. We check that soffit vents line up with open rafter bays, that insulation baffles are planned, and that the ridge has enough length for the exhaust the attic needs.

Complex rooflines with short ridges and many hips can make ridge vent alone too small. In those cases we discuss other exhaust options with the builder before the roof is closed in, rather than discovering a hot, damp attic after the family moves in.

Signs to watch for

When it is time to call about new roof installation

1

Trusses are being set

Call before framing finishes so we can review the plans and schedule dry-in right after sheathing.

2

Planning a room addition

Additions need a tie-in plan at the existing roof, and the best time to make it is before demolition starts.

3

Building a detached garage or shop

Outbuildings need their own roof design, flashing details and gutter plan, even when the structure is simple.

4

Sheathing is getting rained on

If your deck is sitting exposed between storms, it needs dry-in quickly to protect the OSB edges.

5

Converting a porch or patio

Enclosing a porch often means changing the roof pitch or tying a new section into the house.

6

Inspection date on the calendar

We plan our work around your framing inspection so nobody has to undo finished roofing.

How the job runs

How our crew handles new roof installation

The same people who look at your roof are the ones who do the work, and they explain each step before it happens.

Call (405) 864-0080
  1. 01

    Plan review

    We go over the plans, pitches, overhangs and penetrations with you or your builder and flag any roof details that need attention.

  2. 02

    Schedule around the build

    We set dates for dry-in and final roofing that fit the framing, inspection and window installation timeline.

  3. 03

    Dry in the structure

    Drip edge, underlayment and ice and water shield go down as soon as the sheathing is ready and inspected.

  4. 04

    Install the roof covering

    Shingles, metal or tile go on with flashing, vents and ridge work, including any tie-in to an existing roof.

  5. 05

    Final check and photos

    We walk the finished roof, photograph details the builder may need, and clean up the job site.

Pricing, plainly

What affects the cost of new roof installation

Every roof is priced after we have seen it. These are the things that move the number up or down.

  • Total roof area and how many hips, valleys and dormers the design includes.
  • The roof covering you choose, from architectural shingles to standing seam metal or tile.
  • Roof pitch, since steep designs need more safety equipment and labor time.
  • Tie-in work on additions, including cutting back and reflashing the existing roof.
  • Ventilation products needed to match the attic size and roofline.
  • Scheduling needs, such as a split dry-in visit and a later return trip for the finished roof.

Need new roof installation in Oklahoma City?

Call any hour. Our own crew inspects, photographs and explains the fix before any work starts.

Call (405) 864-0080
FAQ

New Roof Installation questions

When should I call a roofer during a new home build in Oklahoma City?

Call while the framing is going up, before trusses are fully set. That gives us time to review the plans, confirm the dry-in date, and coordinate with your framing inspection.

Can a new roof installation on an addition match my existing shingles?

We try to find the same shingle line and color, but older shingles fade and some lines are discontinued. If a close match is not possible, we will explain the options, including reroofing one visible slope so the transition looks intentional.

What does dry-in mean on a new roof installation?

Dry-in means the deck is covered with underlayment, drip edge and ice and water shield so rain cannot soak the framing. It lets interior trades start before the finished roof covering goes on.

Do you install roofs on detached garages and shops around Oklahoma City?

Yes. We roof detached garages, workshops and barns with shingles or metal panels, and we plan the gutters and drip edge so water drains away from the slab.

Who handles the permit for a new roof installation on a new home?

On new construction the builder or owner-builder usually pulls the building permit for the whole project. We work within that permit and schedule around its inspections, and we will tell you if a separate roofing permit applies to your project.

Related work

Other services homeowners pair with this

Roof Ventilation

Balanced intake and exhaust for OKC attics: ridge vents, soffit vents and fans set up to cut summer heat and winter moisture.

Learn more

Seamless Gutters

Seamless gutters rolled on site, sized for Oklahoma downpours, with downspouts placed to keep water off your foundation.

Learn more

Where we do new roof installation

Oklahoma City and the surrounding metro, including:

Cleveland CountyGaillardia, Oklahoma CityBelle Isle, Oklahoma CityPutnam Heights, Oklahoma CityEarlywine, Oklahoma CityMidwest CityGuthrieNichols HillsAll service areas
Call (405) 864-008024/7